We began to install the master cylinders recently. First we had to fab a mount for them. Second we had to extend the pedal push rod. This is what we came up with.
We're going to T the front lines together and run them into one of the masters. The rear line will run into the other. No booster. No proportioning valve.
Top view of the mounting. This picture also shows the push rod integration.
The push rod with zerk fitting. Long enough to cover the distance through the firewall. Splits off into 2 ends to compress both cylinders.